Originally Posted by
JohnTRourke
why would you need a new yard?
I'm confused
We're talking sprinkler systems here.
the tap is done, a clock exists, everything else is relatively straight forward.
Probably $1500 bucks in parts and rental of a trencher or a pipe puller at most. probably less.
new correctly designed system.
My water bills can exceed $300 a month in the summer (and this month is going to be ridiculous) and I have a well designed system (pretty big yard).
If we can knock $100 off a month from not running twice as much, in 15 months it's paid for. that's about 3 years of watering.
that pays for itself.
Plus, the grass is green and the system works.
I never said or alluded to replacing the yard. that's plain silly.