So we are buying a house that currently has Solarcity panels installed and we are taking over the lease. Since I didn't have the benefit of speaking to them during the installation nor being there during the installation...is there anything that I should look for when we do the inspection?

Also, the ability to store the power and use it later intrigues me greatly. Is that something that you can do without a masters in electrical engineering nor without voiding warranties?