Quote Originally Posted by Roger Ronas View Post
Actually there are two different piles at the lumberyard, 8'(96") and what they call precuts (92 5/8")
Roger
I must be going to the wrong places or looking in the wrong place then, I Haven't seen 96" in a long time. It's either 92 5/8" or 10'