Close
Results 1 to 10 of 23

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    The "Godfather" of COAR Great-Kazoo's Avatar
    Join Date
    Sep 2003
    Location
    Washboard Alley, AZ.
    Posts
    48,077

    Default

    Quote Originally Posted by Grant H. View Post

    . My brothers and I just got done with a 6kw system for my parents. No more grid power except for the 2 220V circuits that have the welders, and other heavy equipment. The solar can run these, but why do it, unless necessary. We didn't grid tie it, but instead installed a separate panel next to the grid tie, and pulled everything but those circuits off. No need for grid tie permits or insurance, greatly reducing the unnecessary overhead.

    . If you are going to pay for solar, split your house from the grid, and install solar to run some portion of the house. You instantly start saving money, and you can either "pay" yourself back for the initial investment, or you can roll the savings into growing your solar install, to move more circuits later. Literally, install a second panel, and move the circuits that you want to solar. Allows for a slower swap, and you can build your panel/battery banks as funds/needs allow.


    Be interested in a write up / cost break down on your build & install. WE hope to be out of this place , eventually. BUT having said info, breakdown of cost is beneficial to us later on , as i'm sure it is for others today.
    The Great Kazoo's Feedback

    "when you're happy you enjoy the melody but, when you're broken you understand the lyrics".

  2. #2
    They only multiply when your wife is looking Post Toastie's Avatar
    Join Date
    Nov 2008
    Location
    Rural Boulder county
    Posts
    378

    Default

    Quote Originally Posted by Great-Kazoo View Post
    Be interested in a write up / cost break down on your build & install. WE hope to be out of this place , eventually. BUT having said info, breakdown of cost is beneficial to us later on , as i'm sure it is for others today.
    Seconding this. A diagram of the install would be of interest to many of us here.
    Preparation does not guarantee success, but the lack of preparation guarantees failure - old Japanese proverb

  3. #3
    Rebuilt from Salvage TFOGGER's Avatar
    Join Date
    Dec 2008
    Location
    Aurora
    Posts
    7,784

    Default

    Quote Originally Posted by Post Toastie View Post
    Seconding this. A diagram of the install would be of interest to many of us here.
    +2

    Trying to get the wife on board with grid tied/battery backup solar, but the cost and wiring issues are a stumbling block. If we could do it in stages, at a reasonable cost, she'd probably sign off on it.
    Light a fire for a man, and he'll be warm for a day, light a man on fire, and he'll be warm for the rest of his life...

    Discussion is an exchange of intelligence. Argument is an exchange of
    ignorance. Ever found a liberal that you can have a discussion with?

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •