I had the inspector out last week and he told me I needed to run 4/0 4/0 2/0 wire from the meter box to the house, roughly 100 feet. I ran 4/0 4/0 4/0 and connected them. There are two 7 foot ground rods at the house connected with #4 solid wire. Now that it is buried he wants me to run a 6 gauge stranded wire to connect meter box ground to the ground at the house. Is there a reason I need to connect these? I did everything that was asked, but the inspectors keep coming up with more stuff. I write everything in a notebook when they tell me and check it off as completed, so I didn't just "miss" it.