Close
Page 3 of 3 FirstFirst 123
Results 21 to 27 of 27
  1. #21
    QUITTER Irving's Avatar
    Join Date
    Nov 2008
    Location
    Denver, CO
    Posts
    46,527
    Blog Entries
    1

    Default

    My wife complains about anything that is under 80 degrees. We only have a few rooms that aren't tile or vinyl now. Either way the carpet is going, at her request. Just need to decide what to install. I like the idea of tile over concrete because I regularly see that combination survive water losses in homes. Seems like a prudent way to go.
    "There are no finger prints under water."

  2. #22
    Beer Meister DFBrews's Avatar
    Join Date
    Dec 2010
    Location
    With the classyish Hipsters...Stapleton
    Posts
    3,175

    Default

    The subfloor pex is the sole heating mechanism for the home with solar heaters being the primary energy medium but there is a boiler for back up as well
    You sir, are a specialist in the art of discovering a welcoming outcome of a particular situation....not a mechanic.

    My feedback add 11-12 ish before the great servpocaylpse of 2012

  3. #23
    Stircrazy Jer jerrymrc's Avatar
    Join Date
    Jan 2004
    Location
    Colorado Springs
    Posts
    8,166

    Default

    When we do the floor in the bathroom we are going to install the strip heater. I only need a 90W piece and will put it on a timer for the morning. I have the thermostat set for a bump in the winter time when i get up. Takes the chill off in the bathroom.
    I see you running, tell me what your running from

    Nobody's coming, what ya do that was so wrong.

  4. #24
    Burnin' It Down!
    Join Date
    Mar 2010
    Location
    Denver By the Creek
    Posts
    228
    Blog Entries
    1

    Default

    As a pro I have got to warn you, particularly since you said your existing tile looks "homey".

    1) 500 sf is a LOT of tile to start practicing with.
    2) Unless you have a LOT of practice you most likely will not know it's jacked up until it's done. You can only demo a messed up job.
    3) The material you spec'd out is on the more expensive end. (See line item 2)
    4) If you choose to DIY be sure to check the continuity before, 1/4 and 1/2 way through your tile instal. Then check it before you gout.

    Give me a call if you need some help. Forum members get steep discounts.
    Last edited by Bmac; 06-03-2015 at 16:18.

  5. #25
    QUITTER Irving's Avatar
    Join Date
    Nov 2008
    Location
    Denver, CO
    Posts
    46,527
    Blog Entries
    1

    Default

    I haven't forgotten you Bmac. In fact, I was thinking about doing all the demo work first , then calling you for the install.
    "There are no finger prints under water."

  6. #26
    Burnin' It Down!
    Join Date
    Mar 2010
    Location
    Denver By the Creek
    Posts
    228
    Blog Entries
    1

    Default

    GOD! My typing is TERRIBLE. Thanks for thinking of me. It's not impossible, and certainly isn't putting man on the moon, but it does take patience, GREAT LAY OUT, and patience. With a medium that has a finite dry time. And when it dries, it dries on EVERYTHING simultaneously, even things you didn't touch!

    I let my partner Eric do all the tile, paint and DW finish (Actually,,, He wont let ME do any of those things) because he does a fantastic product (the practice thing)

  7. #27
    QUITTER Irving's Avatar
    Join Date
    Nov 2008
    Location
    Denver, CO
    Posts
    46,527
    Blog Entries
    1

    Default

    Even though the demo is the cheapest part, anything I can save to put toward a quality product, and installation will go a long way.
    "There are no finger prints under water."

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •