    Considering adding two walls to finish a loft off into a bedroom with a closet. Size is approximately 12X13.

    Basically adding two walls, a door and a closet and painting to match the current walls.

    I don't need an accurate estimate at this point but is this a $5K or 15K job, I have absolutely no idea what it costs to do something like this.

    Attachment 60605Attachment 60606

    We want to end up with something like this. This is the same house and a similar angle to pic 2 from above.

    Attachment 60607

  2. #2
    High Power Shooter eneranch's Avatar
    Join Date
    Jul 2012
    Location
    Colorado Springs
    Posts
    962

    Default

    DIY for under $5K pretty easily; Electrical & HVAC would be hardest part as far as I can see.
    Take no Prisoners, and shoot the Wounded


    My Feedback Thread

  3. #3
    Grand Master Know It All
    Join Date
    Mar 2006
    Location
    Dickshooter, ID
    Posts
    4,828

    Default

    Can't tell the height. Guessing 9'. If you save the carpet and do a full diy. $2500

    Matching trim might be an issue. No need to move the hvac that I can see. You will have to move the switches by the vase

  4. #4
    Grand Master Know It All newracer's Avatar
    Join Date
    Nov 2004
    Location
    Timnath
    Posts
    4,582

    Default

    I agree with Wilf202, not an expensive job at all especially if you do it yourself. Looks like the HVAC return will be in the hall so you will need to account for that. You can simple put a pass through vent above the new door.

  5. #5
    Machine Gunner th3w01f's Avatar
    Join Date
    Nov 2010
    Location
    Castle Rock, CO
    Posts
    1,626

    Default

    Thanks for the feedback. This would definitely not be a DIY, I'm on the road about 80% of the time and it would need to be done in a couple weeks.... on top of that I don't have any experience for a DIY.

  6. #6
    The "Godfather" of COAR Great-Kazoo's Avatar
    Join Date
    Sep 2003
    Location
    Washboard Alley, AZ.
    Posts
    48,074

    Default

    Quote Originally Posted by th3w01f View Post
    Thanks for the feedback. This would definitely not be a DIY, I'm on the road about 80% of the time and it would need to be done in a couple weeks.... on top of that I don't have any experience for a DIY.
    In a couple of weeks from now. Or a couple of weeks from start - finish ? Contractors are 4 - 6 weeks out, easy.
    The Great Kazoo's Feedback

    "when you're happy you enjoy the melody but, when you're broken you understand the lyrics".

  7. #7
    QUITTER Irving's Avatar
    Join Date
    Nov 2008
    Location
    Denver, CO
    Posts
    46,527
    Blog Entries
    1

    Default

    Quote Originally Posted by Great-Kazoo View Post
    In a couple of weeks from now. Or a couple of weeks from start - finish ? Contractors are 4 - 6 weeks out, easy.

    This is true, so something to keep in mind.
    "There are no finger prints under water."

  8. #8
    If I had a son he would look like....Ben SideShow Bob's Avatar
    Join Date
    Mar 2010
    Location
    SE Aurora
    Posts
    7,120

    Default

    A pick up load of 2X4s, a flat of dry wall, about 100 ft of romex, 4 - 5 duplex outlets and boxes, two - three switches, a ceiling fixture box.
    Two pre-hung doors, (mandatory closet). HVAC is already there I the ceiling, dry wall tape, mid and paint of your choice.

    A whole pig on a pit grill, a couple of kegs of beer, a long holiday weekend and an open invitation to all skilled members on the site and you will have that bedroom......
    The none skilled in construction trades can be cooks and laborers and go-fers.
    Last edited by SideShow Bob; 08-29-2015 at 21:36.
    My T.P. wheeling and dealing feedback is here.

    Opinions are like assholes, everybody has one, and it stinks more than mine.


    Yo Homie, That my chainsaw ?



    Pati, improbe et vince

  9. #9
    Grand Master Know It All
    Join Date
    Mar 2006
    Location
    Dickshooter, ID
    Posts
    4,828

    Default

    Depends on some variables but I'd likely come in around $6500 to bid that. This is not a solicitation for work. I'm booked for a year

  10. #10
    Machine Gunner th3w01f's Avatar
    Join Date
    Nov 2010
    Location
    Castle Rock, CO
    Posts
    1,626

    Default

    Thanks again. Just to clarify, I'd like to get it done within 1 - 2 weeks of the start date and there is no urgency on getting it started. Probably before Christmas.
    Sideshow, I like the way you think.

    Wulf, thanks for the details.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •