Close
Results 1 to 10 of 91

Thread: Solar Stuff...

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    "Beef Bacon" Commie Grant H.'s Avatar
    Join Date
    Jul 2007
    Location
    Longmont
    Posts
    2,443

    Default

    Quote Originally Posted by gnihcraes View Post
    Thanks. Not looking for a panel, just a portable inverter large enough to run the wood pellet stove and a 12 volt deep cycle shown in my previous build^. More of an experiment to see how long it will last. Might build up a battery bank to support it for a longer duration.
    Makes sense. I would go browse through Samlex and Aims offerings and shop the part number you want around for the best price.

    Side note, do you actually need pure sine?

    What, I suppose the pellet stove needs pure sine wave for timing purposes?
    Last edited by Grant H.; 05-19-2017 at 12:08.
    Living the fall of an empire sucks!
    For your convenience, a link to my Feedback

  2. #2
    My Fancy Title gnihcraes's Avatar
    Join Date
    Apr 2008
    Location
    CastleRock/Lakewood
    Posts
    4,426

    Default

    Quote Originally Posted by Grant H. View Post
    Makes sense. I would go browse through Samlex and Aims offerings and shop the part number you want around for the best price.

    Side note, do you actually need pure sine?

    What, I suppose the pellet stove needs pure sine wave for timing purposes?
    Not sure it needs pure sine, but it does have some control boards that I'd rather not fry. Auger motor and blower motor can't take much power, it's the igniter that chews up the initial load. thus why it says 800 watts required.

    Looks like there might be some Aims on amazon used for reasonable price.

  3. #3
    Stircrazy Jer jerrymrc's Avatar
    Join Date
    Jan 2004
    Location
    Colorado Springs
    Posts
    8,166

    Default

    Quote Originally Posted by gnihcraes View Post
    Not sure it needs pure sine, but it does have some control boards that I'd rather not fry. Auger motor and blower motor can't take much power, it's the igniter that chews up the initial load. thus why it says 800 watts required.

    Looks like there might be some Aims on amazon used for reasonable price.
    My backup for my pellet stove had 240 Ah of AGM batteries tied into a 700 watt UPS. the load running the blower and auger was 120W running the blower and another 55 or so for the auger. I ran it once for 5+ hours on battery and it was above 50%.
    I see you running, tell me what your running from

    Nobody's coming, what ya do that was so wrong.

  4. #4
    My Fancy Title gnihcraes's Avatar
    Join Date
    Apr 2008
    Location
    CastleRock/Lakewood
    Posts
    4,426

    Default

    Quote Originally Posted by jerrymrc View Post
    My backup for my pellet stove had 240 Ah of AGM batteries tied into a 700 watt UPS. the load running the blower and auger was 120W running the blower and another 55 or so for the auger. I ran it once for 5+ hours on battery and it was above 50%.
    awesome. good to know. Someday I'll quit being lazy and measure it all while running.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •