Quote Originally Posted by def90 View Post
Should have pulled all the exterior off and insulated while you could.
No real opportunity to do so as "pulling it off" would have cost me both in materials (whatever that would have been in place of the celotex), and the contractor time. I will have to do the typical cut the holes and blow stuff in from the interior whenever I get around to it.