Yep, good trick there converting part of the pull from horizontal to semi-vertical.
With the eye screw - I was hoping to maybe take a field jack or even long pry bar to do the real work.
The break is below the cement where the fence post is located.
Another trick I was thinking is to rent a power washer and use water power to "dig" around the post area.