We treated it like warmups each time we needed to move stuff to the basement since the original plan was to set it up in the garage. Just moving those mats was a chore since they're 4ft x 6ft and 100lbs each. Every couple of weeks we'd go load up the car in Denver, bring it home, unload to the garage and then (eventually) down to the basement. Then... assembly. Some of that stuff is a real bear to assemble as it's quite large & heavy with some serious hardware. The power rack in the middle uses 1" dia. hardware that has 36mm heads on it! Pretty serious stuff. I managed to shatter one of my 1/2 impact adapters at one point during a freak accident that almost claimed my left trigger finger. Wife said I needed stitches after looking at it. I was like "Nah, I'm good" but probably would have taken her up on it if it were my right trigger finger. lulz
You'd think I'd be stronger and have better cardio with all of the effort it took to set this thing up... and you'd be wrong. Haha