I've been working on the structure for the mountain crapper (thanks for all the input in earlier post).
Hauling 16 sacks of concrete uphill was almost as fun as digging the holes in rock.
The beginning...
First wall:
Another wall:
all the walls:
Roof trusses:
Sheathing:
Roof:
Dried-in w/ door & windows:
I have some cedar bevel-lap siding I need to stain and nail up after the rest of the moisture barrier is up, then finish the eves/soffits. I haven't decided on the model of composting toilet yet, but it'll be the spring before it goes in. Wife calls it the "Loo with a View".