Close
Results 1 to 9 of 9
  1. #1
    Paper Hunter nells08's Avatar
    Join Date
    Feb 2011
    Location
    Aurora
    Posts
    173

    Default Anyone have a rifle in parts........

    That they are putting together soon? Thought maybe we could have a build night! Anyone interested?

  2. #2
    MODFATHER cstone's Avatar
    Join Date
    Mar 2010
    Location
    Baltimore, MD
    Posts
    7,472

    Default

    I need to put a lower parts kit into a Cav Arms lower. That shouldn't take more than 20 minutes (figure 10 minutes of that is chasing springs around the room). I just haven't had the time with all of the travel recently.

    Any dates/times in mind?
    Corruptissima re publica plurimae leges.

    My Feedback

  3. #3
    Paper Hunter nells08's Avatar
    Join Date
    Feb 2011
    Location
    Aurora
    Posts
    173

    Default

    Nope, no date/time yet. I wanted to see who all was interested I guess I could possibly say June 2???? That would give some folks that are waiting on parts to get some stuff together and my parents to leave!

  4. #4
    The "Godfather" of COAR Great-Kazoo's Avatar
    Join Date
    Sep 2003
    Location
    Washboard Alley, AZ.
    Posts
    48,099

    Default

    Quote Originally Posted by cstone View Post
    I need to put a lower parts kit into a Cav Arms lower. That shouldn't take more than 20 minutes (figure 10 minutes of that is chasing springs around the room). I just haven't had the time with all of the travel recently.

    Any dates/times in mind?

    Bring it up saturday, i will be doing a few re barrels and 1-2 ar lowers in the mix.
    The Great Kazoo's Feedback

    "when you're happy you enjoy the melody but, when you're broken you understand the lyrics".

  5. #5
    High Power Shooter 20X11's Avatar
    Join Date
    Mar 2012
    Location
    SE Aurora
    Posts
    885

    Default

    sounds like a great idea...not sure my barrel will be in by the 2nd(2nd is bad for me anyway), they keep moving back the expected in stock date. I have everything else though, so maybe if the date gets pushed back a week or so, I could at least get the lower together?

  6. #6
    MODFATHER cstone's Avatar
    Join Date
    Mar 2010
    Location
    Baltimore, MD
    Posts
    7,472

    Default

    I will be out shooting on the 2nd.

    I need to rattle can the lower before I install the LPK. I'm trying to color code weapons of the same calibers : )
    Corruptissima re publica plurimae leges.

    My Feedback

  7. #7
    Paper Hunter nells08's Avatar
    Join Date
    Feb 2011
    Location
    Aurora
    Posts
    173

    Default

    Quote Originally Posted by jim View Post
    Bring it up saturday, i will be doing a few re barrels and 1-2 ar lowers in the mix.
    This sat? My rail won't be delivered til mon! Waiting on a MI SS gen 2! If we can get people together I can wait to put it together!

  8. #8
    Paper Hunter nells08's Avatar
    Join Date
    Feb 2011
    Location
    Aurora
    Posts
    173

    Default

    Quote Originally Posted by 20X11 View Post
    sounds like a great idea...not sure my barrel will be in by the 2nd(2nd is bad for me anyway), they keep moving back the expected in stock date. I have everything else though, so maybe if the date gets pushed back a week or so, I could at least get the lower together?
    What kind of barrel are you waiting on?

  9. #9
    High Power Shooter 20X11's Avatar
    Join Date
    Mar 2012
    Location
    SE Aurora
    Posts
    885

    Default

    Quote Originally Posted by nells08 View Post
    What kind of barrel are you waiting on?
    DPMS Dissipator

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •