I need to put a lower parts kit into a Cav Arms lower. That shouldn't take more than 20 minutes (figure 10 minutes of that is chasing springs around the room). I just haven't had the time with all of the travel recently.
Any dates/times in mind?
I need to put a lower parts kit into a Cav Arms lower. That shouldn't take more than 20 minutes (figure 10 minutes of that is chasing springs around the room). I just haven't had the time with all of the travel recently.
Any dates/times in mind?